Plaster works Works shtukatura Shtukaturu Shtukaturu for work

Preparation of premises and walls

IS DECORATIVE

At facing of walls gipsokartonnymi sheets of special requirements to preparation of premises is not present. As well as at monolithic plaster, the bases under a parquet and linoleum here should be ready, apertures and furrows for electroconducting and pipelines are made. It is necessary to pay attention to humidity of designs. Humidity of stone walls should not exceed 8, and wooden - 18%

In the Winter the temperature in premises should be not more low -15°C, prior to the beginning of furnish they need to be heated not less than 5... 6 days, and houses combined by a method of freezing, - not less than 10 days.

If indoors it is necessary to execute wet and dry plasters at first do wet and allow to it to dry out. Only after that it is possible to begin facing.